• 3.51K Posts
  • 7.14K Comments
Joined 3 years ago
cake
Cake day: June 10th, 2023

help-circle











  • 2026-01-21:

    • Massey’s: Overnight, B18.3 was crush-tested to failure, buckling just below the common dome. (ViX 1, ViX 2)
    • In the evening, venting from Massey’s indicates another night of testing, presumably S39.1 (Sorensen)
    • Build site: The Starlink PEZ dispenser loader exits Starfactory and travels down Highway-4 making a right turn onto Remedios Ave, likely headed to Megabay 2. (wvmattz)
    • Launch site: Overnight, another large tank is moved from Brownsville Port to Pad 2. (ViX)
    • During the day, another smaller tank is delivered to the air separation site and lifted into position by the LR1500 and LR11000 cranes. (ViX, ViX 2)
    • Drilling at Pad 1 continues. (NSF)
    • Road delay for “Port of Brownsville to ASU” is posted for Jan 21st 23:59 to Jan 22nd 04:00. (starbase.texas.gov, archive, ViX)